Project of reinforcement and extension of electrical networks
Increase the capacity of the electrical energy distribution system and guarantee access to reliable, quality electrical energy for the populations
-
Eurobond issuances
July 2021
-
Pillar
Prosperity
-
Expenditure category
Access to low-carbon, reliable and affordable energy
-
Link website
View website
Impacts and results
Increase of the supply capacity of the SME and SMI located in the ALLADA-ATTOGON-DESSA corridor and stabilization of the voltage at the HOSPITAL OF ALLADA REFERENCE ZONE
Construction of 90 km of MV networks and 56.5 km of LV networks;
Installation and connection of 26 transformers
16,000 beneficiaries
Installation of 32 overhead distribution switches
Installation of 355 public lighting lamps