Project of reinforcement and extension of electrical networks

Increase the capacity of the electrical energy distribution system and guarantee access to reliable, quality electrical energy for the populations

  • Eurobond issuances

    July 2021

  • Pillar

    Prosperity

  • Expenditure category

    Access to low-carbon, reliable and affordable energy

  • Link website

    View website

Impacts and results

Increase of the supply capacity of the SME and SMI located in the ALLADA-ATTOGON-DESSA corridor and stabilization of the voltage at the HOSPITAL OF ALLADA REFERENCE ZONE

Construction of 90 km of MV networks and 56.5 km of LV networks;

Installation and connection of 26 transformers

16,000 beneficiaries

Installation of 32 overhead distribution switches

Installation of 355 public lighting lamps